2019 Interceptor Outfall Phase 2, Project No. 2018-28

The work is described generally as mobilization and demobilization, pre-and post-construction closed circuit television (CCTV) inspection, pipeline cleaning, pipeline testing, manholes modification and rehabilitation (MH-11), installation of temporary access locations and rehabilitation of 2,896 linear feet of 24-inch ACP forcemain from MH-5 to MH-11 parallel to the Laguna de Santa Rosa by pressurized cured-in-place pipe (PCIPP) lining method. The work includes pressurized cured-in-place pipe lining of the existing 24-inch ACP.

The Contractor must have a valid California Class A contractor's license. The Engineer’s estimate for this project is $1,190,000.

A copy of the drawings and specifications may be obtained from Draftech Blueprinting is located at 1544 Terrace Way, Santa Rosa, CA 95404, phone number (707) 578-9442, upon payment of a nonrefundable fee as specified by Draftech. The planholders list and all addendums shall be issued either directly through the City or through Draftech. In order to ensure receipt of addendums, any party interested in the project shall place their information with Draftech.


Bids Due:
Thursday, June 25, 2020, at 2:00 PM
130 Avram Avenue, Rohnert Park, CA 94928

VIEW BID OPENING LIVE AT: https://zoom.us/j/91663539127



Bid Documents

Bid Results

Project Contact:

Justin Brandt
Associate Engineer
Development Services
Direct Line: (707) 588-2252
Main Phone: (707) 588-2232
Fax: (707) 794-9242
Email: jbrandt@rpcity.org

Social Media